Element Hotel – HVAC Phase 2

System Activation: Rooftop Unit Phase 2 Complete

The rooftop power system at the Element Hotel in East Dallas is officially live! Following our Phase 1 infrastructure build, our team has completed the final connection and commissioning.

Recent Scope of Work:

  • Finalized electrical runs directly to the unit.

  • Installed a primary safety switch disconnect.

  • Energization & Testing: Rigorously verified system performance and circuit integrity for long-term reliability.

From initial infrastructure to final activation, Jefco Electric delivers professional precision at every stage.